You are here : Events
Events
Azarsimab Signed the contract of Construction of roads and  Concrete bridge  over the main channel – Khodafarin Dam. the client is East Azarbaijan Regional Water authority .
The contract of construction of surface facilities in Sohrab   oil fields (EPC) was signed by Azarsimab and  Arvandan Oil and Gas Co. 
Azarsimab Signed the contract of Operation of pipelines sour gas  Refinery phases 20 and 21South Pars  with   OIEC .
Construction of Sohanak Multi-Storey Parking will be done by Azarsimab. The employer is Omran Gostar Emdad .
The contract  of construction of water supply to the refinery Phases 20 & 21 (Sea Water) was signed by Azarsimab and OIEC  .
Azarsimab Signed the contract of construction of Sahand New Town Street . The employer  is Ministry of Road and Transportation.
Azarsimab Signed the contract of Operation of piles for multipurpose quay and wall's protection of waterways in Amirabad Port .
Signing the contract of  Construction of grade separation Arregar with Dampezeshki between Azarsimab and Tabriz Omran .
The contract  of Construction of reservoirs and   Powerhouse  The forest area of ​​West – chitgar was signed by Azarsimab and Tehran Municipality .
Signing the contract of Construction of a street in Sahand  New Town-Tabriz with the client of Road & Transportation Ministry .
Signing the contarct of construction for commercial buildings in  West Lake area of Khalij Fars  with client of Tehran  Municipality.
Azarsimab signed the contract of Construction for grade separation Arregar with Dampezeshki in Tabriz . The client is Tabriz Omran Company.
Implementation of in-situ concrete piles of TCI complex consist of 24 piles included of  Preparation Fittings will be done by Azarsimab . the client of project is Saman Sazeh Ghadir Company .
Winning the IPMI’s tender for SOSBL (EPC) project in asalouye on March 2010
Rural and Nomads social insurance Assigned implementation of Tehranpars Building to Azarsimab. This project included of Execution concrete and steel structures of Tehranpars commercial building in 10 floors .
Operations  of piles for multipurpose quay and wall"s protection of waterways in Amirabad Port  will be done by Azarsimab In partnership with Moshiran Company. The client of project is Special Economic Zone Amirabad Port.
Azarsimab in partnership with Tarh-Now Andishan Co. assumed the implementation of OUT FALL in Phases 20 and 21 in  Southern Pars . The client of this project is IPMI Company.
Construction of Block D in the arround of Tabriz Kabood Mosque was assigned to Azarsimab. the client of this project is Tabriz municipality.
The Implementation of Northern Corridor project (NOSBL) in Phases 20 and 21 in Assalouye was assigned to Azarsimab. The client of NOSBL is Consortium Phase 20-21 .
The implementation and construction of the concrete foundation and structure of Tehran Mall project was assigned to Azarsimab. The client of this project is Tehran Mall Company.
Signing the contract of the construction of peripheral buildings of Chamshir ‘s Powerhouse and Dam.
Copyright 2024 by Azarsimab Corporation
Design and powerd by : Hirad Group