فارسی
Home
About Us
History
Board of Directors
Management systems
Key Personnel
Join and consents
Membership of the Association
Specialized machinery
Excavation, piling and pile driving
Underground piping
Stone columns, Nailing, anchor and micro-pile
Dynamic compaction
Soil stabilization, cold recycling of asphalt Tarshy
Earthworks
Production of asphalt, concrete and aggregates
Public
Projects
Highway and Bridge
Port, Coastal and Marine Structures
Dam and irrigation and drainage network
Construction of oil and gas and petrochemical facilities
Construction of water and sewer utilities
Soil improvement and ground reinforcement
Metro rail lines and structures
Industrial and special foundations, pile-situ
Soil stabilization, slope, digging trenches and walls
Residential, office and commercial
Partners
Contact Us
Job
Events
login
ورود همکاران
همکار گرامی لطفا سیستم مورد نظر را انتخاب نمایید
ورود
Link
ورود کارفرمایان
کارفرمای گرامی لطفا پروژه مورد نظر را انتخاب نمایید
ورود
Link
You are here :
Events
Events
Azarsimab Signed the contract of Construction of roads and Concrete bridge over the main channel – Khodafarin Dam
Monday 11 April 2016
Azarsimab Signed the contract of Construction of roads and Concrete bridge over the main channel – Khodafarin Dam. the client is East Azarbaijan Regional Water authority .
The contract of construction of surface facilities in Sohrab oil fields (EPC) was signed by Azarsimab and Arvandan Oil and Gas Co
Sunday 15 March 2015
The contract of construction of surface facilities in Sohrab oil fields (EPC) was signed by Azarsimab and Arvandan Oil and Gas Co.
Azarsimab Signed the contract of Operation of pipelines sour gas Refinery phases 20 and 21South Pars with OIEC
Sunday 15 March 2015
Azarsimab Signed the contract of Operation of pipelines sour gas Refinery phases 20 and 21South Pars with OIEC .
Construction of Sohanak Multi-Storey Parking will be done by Azarsimab
Sunday 15 March 2015
Construction of Sohanak Multi-Storey Parking will be done by Azarsimab. The employer is Omran Gostar Emdad .
The contract of construction of water supply to the refinery Phases 20 & 21 (Sea Water) was signed by Azarsimab and OIEC
Sunday 15 March 2015
The contract of construction of water supply to the refinery Phases 20 & 21 (Sea Water) was signed by Azarsimab and OIEC .
Azarsimab Signed the contract of construction of Sahand New Town Street
Sunday 15 March 2015
Azarsimab Signed the contract of construction of Sahand New Town Street . The employer is Ministry of Road and Transportation.
Azarsimab Signed the contract of Operation of piles for in Amirabad Port .
Sunday 15 March 2015
Azarsimab Signed the contract of Operation of piles for multipurpose quay and wall's protection of waterways in Amirabad Port .
Signing the contract of Construction of grade separation Arregar with Dampezeshki
Sunday 15 March 2015
Signing the contract of Construction of grade separation Arregar with Dampezeshki between Azarsimab and Tabriz Omran .
The contract of Construction of reservoirs and Powerhouse The forest area of West – chitgar was signed by Azarsimab
Sunday 15 March 2015
The contract of Construction of reservoirs and Powerhouse The forest area of West – chitgar was signed by Azarsimab and Tehran Municipality .
Signing the contract of Construction of a street in Sahand New Town-Tabriz
Wednesday 23 July 2014
Signing the contract of Construction of a street in Sahand New Town-Tabriz with the client of Road & Transportation Ministry .
Signing the contarct of construction for commercial buildings in West Lake area of Khalij Fars
Wednesday 23 July 2014
Signing the contarct of construction for commercial buildings in West Lake area of Khalij Fars with client of Tehran Municipality.
Azarsimab signed the contract of Construction for grade separation Arregar with Dampezeshki in Tabriz
Wednesday 23 July 2014
Azarsimab signed the contract of Construction for grade separation Arregar with Dampezeshki in Tabriz . The client is Tabriz Omran Company.
Signing the contract of Implementation of in-situ concrete piles of TCI complex
Monday 21 July 2014
Implementation of in-situ concrete piles of TCI complex consist of 24 piles included of Preparation Fittings will be done by Azarsimab . the client of project is Saman Sazeh Ghadir Company .
Winning the IPMI’s tender for SOSBL (EPC) project in asalouye on March 2010
Monday 30 June 2014
Winning the IPMI’s tender for SOSBL (EPC) project in asalouye on March 2010
Rural and Nomads social insurance Assigned implementation of Tehranpars Building to Azarsimab
Monday 30 June 2014
Rural and Nomads social insurance Assigned implementation of Tehranpars Building to Azarsimab. This project included of Execution concrete and steel structures of Tehranpars commercial building in 10 floors .
Operations of piles for multipurpose quay and wall"s protection of waterways in Amirabad Port will be done by Azarsimab
Monday 30 June 2014
Operations of piles for multipurpose quay and wall"s protection of waterways in Amirabad Port will be done by Azarsimab In partnership with Moshiran Company. The client of project is Special Economic Zone Amirabad Port.
Azarsimab assumed the implementation of OUT FALL in Phases 20 and 21 in Southern Pars
Monday 30 June 2014
Azarsimab in partnership with Tarh-Now Andishan Co. assumed the implementation of OUT FALL in Phases 20 and 21 in Southern Pars . The client of this project is IPMI Company.
Construction of Block D in the arround of Tabriz Kabood Mosque was assigned to Azarsimab
Monday 30 June 2014
Construction of Block D in the arround of Tabriz Kabood Mosque was assigned to Azarsimab. the client of this project is Tabriz municipality.
The Implementation of Northern Corridor project (NOSBL) in Phases 20 and 21 in Assalouye was assigned to Azarsimab
Monday 30 June 2014
The Implementation of Northern Corridor project (NOSBL) in Phases 20 and 21 in Assalouye was assigned to Azarsimab. The client of NOSBL is Consortium Phase 20-21 .
The Implementation of the concrete foundation and structure of Tehran Mall project was assigned to Azarsimab
Monday 30 June 2014
The implementation and construction of the concrete foundation and structure of Tehran Mall project was assigned to Azarsimab. The client of this project is Tehran Mall Company.
Signing the contract of the construction of peripheral buildings of Chamshir ‘s Powerhouse and Dam
Monday 30 June 2014
Signing the contract of the construction of peripheral buildings of Chamshir ‘s Powerhouse and Dam.