You are here : Events / View

The contract of construction of surface facilities in Sohrab oil fields (EPC) was signed by Azarsimab and Arvandan Oil and Gas Co

The contract of construction of surface facilities in Sohrab  oil fields (EPC) was signed by Azarsimab and  Arvandan Oil and Gas Co. 
Publish date: Sunday 15 March 2015
print
Visit : 2911  Comment : 0
The contract of construction of surface facilities in Sohrab  oil fields (EPC) was signed by Azarsimab and  Arvandan Oil and Gas Co. 
Copyright 2024 by Azarsimab Corporation
Design and powerd by : Hirad Group